top of page

Docs

484075768_627798130062113_8395220335611955286_n.jpg

Pre-Job Checklists

The following checklist will assist us in being able to complete our work quickly and cause less disruption to your routine.

Prior to our arrival:

(BIGGER PROJECTS ONLY) 30% deposit via check/cash (checks to RVG Painting LLC)

⦿  Disconnect wiring from computer, video, TV and stereos. Identify your wires so you can reconnect them correctly.

⦿ Clear off all counters, tables, dressers and shelves of all items.

⦿ Rooms should be clear of all clothing, papers, towels, throw rugs, etc.

⦿ If closets are being painted, please have them emptied prior to our arrival.

⦿  If any pictures, hanging items etc., are staying in their current location, please leave their hardware in place. If they are being moved, please pull the hardware and we will patch the holes.

⦿ Remove contents of kitchen cabinets if they are to be refinished

⦿ Grandfather clocks should be secured or removed from area

⦿ If RVG Painting LLC moves pianos, they will have to be re-tuned by others.

⦿ Remove towels, rugs, and accessories from bath and laundry rooms.

⦿ Take down curtains and draperies. (RVG is not responsible for any damaged window treatment)

⦿  Alarm system should be disabled. (RVG is not responsible for alarm company service fees)

⦿ Make any necessary arrangements for pets.

⦿  Furnace is to be turned off in case of spray application of paint.

⦿ Call us prior to your paint job with any questions or concerns you may have. We will be glad to discuss them with you.

⦿  For your comfort — if you are sensitive to odors (or if anyone is pregnant) you should try to make arrangements to stay away from the jobsite for the duration of the job.

RVG PAINTING LLC will perform the following services:

⦿ Move all large furniture and group in the center of the room.

⦿ All floors and carpeting will be covered with drop cloths.

⦿ All furniture will be covered with plastic sheeting.

⦿ Each room area will be straightened up and furniture will be put back in place upon completion of the job.

⦿ Rubbish and empty paint containers will be removed from the job • Leftover paint cans (if applicable) will be marked and left for the customer.

Final Inspection:

We will inform you of the expected completion day and time.

⦿ We ask that you walk the property with us at the completion of the job to inspect the work and make sure you are happy

⦿ We will perform any touch ups at this time so that we do not have to make a special trip back in the future.

⦿ After you inspect the job, we will send you the final invoice via messaging.

RVG PAINTING, LLC takes pride in our professionalism and craftsmanship. Time is taken to prepare and protect your property as if it were our own and to provide the best possible service to complete your project in an efficient and timely manner. Thank you in advance for reading this information and following these important protocols. We look forward to enhancing the beauty and value of your home. Thank you for your time and consideration.

EXTERIOR PRE-PAINT CHECKLIST

The following checklist will assist us in being able to complete our work quickly and cause less disruption to your routine.

Prior to our arrival:

(BIGGER PROJECTS ONLY) 30% deposit via check/cash (checks to RVG Painting LLC)

⦿  Cut back/take down/remove any bushes, vines, bees or wasp nests that may be touching, connected to, or close to the house.

⦿ Remove and store all items such as furniture, grills, plants from the front and back area that you do not want damaged from pressure-washing.

⦿ Make sure all windows are CLOSED if pressure-washing. Access to water and electric outlet must be available.

⦿ Please make arrangements to contain or remove your pets during the project.

⦿  Please turn off automatic sprinkler systems and alarm systems for the duration of the project..

RVG PAINTING LLC will perform the following services:

⦿ Walkways will be covered with plastic sheeting.

⦿ All furniture will be covered with plastic sheeting.

⦿ Any furniture that we moved will be put back in place upon completion of the job. • Rubbish, empty paint containers, and all trash will be removed from the job.

⦿ Leftover paint cans (if any) will be marked and left for the customer.

Final Inspection:

We will inform you of the expected completion day and time.

⦿ We ask that you walk the property with us at the completion of the job to inspect the work and make sure you are happy.

⦿ We will perform any touch ups at this time so that we do not have to make a special trip back in the future.

⦿ After you inspect the job, we will send you the final invoice via messaging.

RVG PAINTING, LLC takes pride in our professionalism and craftsmanship. Time is taken to prepare and protect your property as if it were our own and to provide the best possible service to complete your project in an efficient and timely manner. Thank you in advance for reading this information and following these important protocols. We look forward to enhancing the beauty and value of your home. Thank you for your time and consideration.

PAINT SHEEN LEVELS

New Project (82).jpg
New Project (83).jpg
bottom of page